One family house requirement specifications
|
|
13 years after the planning of the first plus energy house GEMINI is a new one family house planned. The feasibility is proven, the new challenge is a realization as cheap as possible.
|
Requirements specifications for one family house
|
|
13 years after the planning of the first plus energy house GEMINI is a new one family house planned. The feasibility is proven, the new challenge is a realization as cheap as possible.
|
One family house requirement specifications
|
|
13 years after the planning of the first plus energy house GEMINI is a new one family house planned. The feasibility is proven, the new challenge is a realization as cheap as possible.
|
German EEG solar electric power low
|
|
Guideline: 400m² real estate, a comfortable one family house and the maximal possible earnings by delivering electric power porduced by solar energy. The solution was planned 1991.
|
Operating expenses
|
|
Do not plan a new building with low operating costs. In an energy situation like today.are negative operating expenses the right target.
|