| Second fermenter 1500 m³
|
|
|
| |
The tent roof serves as a gas storage. The storage can store the produced gas for 11.5 hours. At the moment electricity and heat is produced with the gas in a 500 kW gas engine.
|
| Main fermenter 1500 m³
|
|
|
| |
For the start, 1300 ms ³ sanies had been introduced to the bacterial cultivation . Another research equipment got by 2 years without slury supplies, here the researchers hope more.
|
| Solid entry
|
|
|
| |
From the driving silos are up to 50 cubic meters of biomass all at once brought in the solid entry. This thing is comparable, so to speak, to the mouth of the cow.
|
| Driving silo as a biomass depot
|
|
|
| |
10,000 metric tons of biomass of the maize cultivation are delivered here per year in the driving silos. Each of 4 driving silos is 15 ms wide and 70 ms long.
|
| Scheme of the biogas production in Strem
|
|
|
| |
What hangs here as an facility scheme of the Thöni biogas production on a wall, we introduce on the next sides photo for photo in the reality.
|