Scheme of the biogas production in Strem

What hangs here as an facility scheme of the Thöni biogas production on a wall, we introduce on the next sides photo for photo in the reality.

Scheme of the biogas production in Strem
What hangs here as an facility scheme of the Thöni biogas production on a wall, we introduce on the next sides photo for photo in the reality.

The equipment was put into operation on the 10th February, 2005. Achievement is 500 kW of electricity and 535 kW of heat. Annual yield 4,250 electricity MWh and 4,500 MWh heat.